Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the YourChannel domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /data/e/3/e3d894b9-5388-45bd-88bc-9d373884a377/unitatpervilanova.cat/www/wp-includes/functions.php on line 6121

Notice: Accessing static property WPB_YourChannel::$yrc_permission as non static in /data/e/3/e3d894b9-5388-45bd-88bc-9d373884a377/unitatpervilanova.cat/www/wp-content/plugins/yourchannel/YourChannel.php on line 53

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the instagram-feed domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /data/e/3/e3d894b9-5388-45bd-88bc-9d373884a377/unitatpervilanova.cat/www/wp-includes/functions.php on line 6121
Barri Rodes – Resultats Consulta 26-06-2014 – UNITAT per VILANOVA

Barri Rodes – Resultats Consulta 26-06-2014

Els resultats de la consulta realitzada al Barri Rodes al llarg del dia d’ahir, per determinar l’inici de les obres han estat els següents:

PARTICIPACIÓ: 73,45% (han votat 238 de les 324 parcel·les).

RESULTAT:

Vots a favor d’iniciar el procés urbanitzador el 2014: 24

Vots a favor de no tornar a plantejar la qüestió fins al 2018: 214

Vots nuls: 0

Vots en blanc: 0

 

Us de cookies

Unitat empra cookies pròpies i de tercers per millorar la seva experiència de navegació. En continuar navegant entenem que dóna consentiment a la nostra política de cookies. ACEPTAR

Aviso de cookies